- IN SUBSTRUCTURE BLOCK PUT VERTICALY 3 IRON BARS 10 mmAND FILL WITH CONCRETE
- POUR CONCRETE INTO MOLD FOR PARTS OF COLUMN AND ROTATE THEM DUE TO BETTER SEGREGATION.
- AT THAT TIME MOUNT PVC TUBE 5cm WRAPPED WITH NYLON IN MOLD CENTER FOR EASIER DISMOUNT
- BEFORE POURING THE CONCRETE COAT THE MOLD WITH MOTOR OIL
- FINISHED PARTS OF COLUMN FILL IN ORDER ONTO VERTICAL ARMATURE, AND CONNECT THEM WITH CONSTRUCTIVE GLUE
- ONTO PEAK OF COLUMN MOUNT WITH CONCRETE SCREW ABOUT 16 mm, WHICH LINKS UPPER CONSTRUCTION
|
|